
The Grandfather Bridge is a full-blooded BIM project from the tender to the opening of the bridge and beyond.
The Isoisänsilta project, which aimed to achieve paperless design and construction, created new practices for transferring information from one party to another. Design by modelling reduced errors and made the transfer of information faster and clearer. This resulted in significant time and resource savings for the parties involved.
A slick start to information modelling



