Skip to content

Larrieu Altissimo, a building combining steel and concrete structures

2 minute read
| |
June 28, 2021

Share this post:

KP1 logo with the text Créateur de systèmes constructifs below it.

KP1 Bâtiments: designs, manufactures and installs prestressed concrete industrial frames.Website: www.kp1.fr

The metal and concrete structure project.

Based on the digital model, production of execution drawings and installation recommendations.

Challenges to meet

High-voltage line at line level: Reduction in the height of prefabricated poles to avoid the risk of collision with the crane. Addition of a metal bayonet on the poles and installation of a new fastening system at the foot of the pole (PEIKKO system). 0 to 5 A-line: integration of EP downspouts in the poles. The mock-up made it possible to avoid overlooking the reservations to be made in the panels, and to clearly identify the direction of entry and exit of these downpipes.

Find out more about the Tekla BIM Awards France 2020 projects.

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

What is Tekla Structures and why would I use it?

To find out what Tekla Structures does, we asked someone with no experience with the software to put...
Read full article
Article

What are Digital Twins?

A digital twin in construction is a dynamic, living digital replica of a physical asset—such as a bu...
Read full article