Getting the information right is the first step to taking the destiny of your formwork into your own hands.
A significant number of companies still use 2D drawings for planning their buildings. But one of the challenges with this approach is that the formwork planning is disconnected from other construction-planning tasks. This results in a lack of information and reduced planning accuracy.
Formwork always needs to be planned well. And that means collecting information from accurate sources; information about quantities, schedules, available space, and even about temporary structures you need to plan, design and order. In order for information to be accurate, you need a tool that allows it to be shared between different people. It would be best if you had a tool that transforms the correct information into a constructible model that guarantees everything relevant is being taken into account.