Skip to content

They talk to each other - B2W Track and Estimate at D.A. Collins/Kubricky

2 minute read
| |
May 4, 2022

Share this post:

The B2W Estimate and B2W Track combination keeps estimators, project managers and field teams at D.A. Collins/Kubricky construction on the same page, eliminates redundant data entry and provides timely actual-versus-plan data to motivate crews and drive profitability.

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

How George Leslie is driving productivity through connected construction

Faced with a manual and time-consuming survey data process, with a lack of connectivity between fiel...
Read full article
Article

From raw imagery to hard data: The crucial role of AI in construction documentation

Artificial Intelligence (AI) transforms construction documentation by automatically mapping 360° ima...
Read full article