Case study

Biller + Beyer: Modern bridge construction from the capital of bridges

Biller + Beyer demonstrates how efficiency, precision, and design quality in bridge construction can be increased by using modern tools such as Tekla Structures design software and continuous 3D planning.

Impact

  • 30% time savings in creating reinforcement plans
  • High-quality formwork and reinforcement drawings compliant with established standards
  • German onboarding and support team with relevant domain expertise

Summary

"There is still a common assumption in the industry that 3D modeling takes up more time. We can prove the opposite: after just six months of using Tekla Structures, we are working faster and more efficiently than before. In 2025, with our small team, we successfully completed the detailed design for several bridge structures alongside a multitude of other projects."

Gunar Beyer

This summary is in English. The complete case study is available in German. View German version

Tags

Related case studies

Case study

How digital workflows made large-scale steel reuse possible

Learn how William Hare delivered 77% reclaimed steel on 30 Duke Street using Tekla Structures.
Read case study
Case study

Building water treatment at scale: RSE’s move to Tekla Structures

Discover how RSE tripled design output and unlocked manufacturing-ready detail with Tekla Structures.
Read case study
Case study

Case study: Digital workflows unify cross-border bridge build

Learn how Westmate used connected Trimble technology to eliminate downtime on an international steel construction project.
Read case study