EAMR replaced weeks of manual AGV loop measurements with the Trimble Ri total station, handling real-world factory deviations on-site and completing installations in just 30 minutes.

Achievements

  • Reduced layout time from weeks to 30 minutes
  • Handled on-site deviations without redrawing
  • Eliminated complex manual calculations

Solution leveraged

  • Trimble Ri total station

The ability to work faster, safer and more flexibly during installations is a great advantage, and the Trimble Ri is a tool that streamlines the entire process — from planning to completed installation.

Gustaf WallMechanical designer with EAMR

Background

EA Mobile Robotics — a customer of Trimtec, a Trimble authorized dealer — is a division of EA Elektroautomatik in Sweden AB that develops, assembles, programs, operates and installs automated guided vehicle (AGV) and autonomous mobile robot (AMR) solutions. These solutions operate directly within customers' production environments, handling everything from motors and axles to gearboxes. At Volvo, for example, engines hang on EAMR’s load carriers as they go through the assembly line.


Challenge

Traditionally, AGVs are controlled by defined loops milled into the industrial floor. Designing these paths begins in 2D CAD, utilizing factories' existing AutoCAD layouts. However, when EAMR attempted to mark the loops in the factory, the drawing and reality rarely matched.

To solve this, EAMR had developed a triangulation system with reference points that were measured manually and entered into Excel lists. While very accurate, it could take up to two weeks, and for changes, the lists needed to be redone.

Inside a warehouse, a man in safety gear stands in the foreground, with a Trimble Ri total station in the background.

Solution

To streamline the work of drawing and installing the loops that guide the AGVs, EAMR started using the Trimble Ri total station. During installation, reference points are marked directly in the factory using lasers or prisms. The total station accommodates real-world deviations — such as pillars that are 200 millimeters off or protruding details — directly on-site without redrawing or delays.


Results

With the Trimble Ri, the work has completely changed. What previously took a couple of weeks can now be done in about 30 minutes. Mechanical designer Gustaf Wall notes that the new working method is also easier to teach, as the system no longer requires extensive manual calculations. Safety is central in Swedish factories, and EAMR brings the same working approach even when they operate internationally. Ultimately, the Trimble Ri streamlines the entire workflow from planning to completed installation.

Tags

Related case studies

Case study

How digital workflows made large-scale steel reuse possible

Learn how William Hare delivered 77% reclaimed steel on 30 Duke Street using Tekla Structures.
Read case study
Case study

Building water treatment at scale: RSE’s move to Tekla Structures

Discover how RSE tripled design output and unlocked manufacturing-ready detail with Tekla Structures.
Read case study
Case study

Case study: Digital workflows unify cross-border bridge build

Learn how Westmate used connected Trimble technology to eliminate downtime on an international steel construction project.
Read case study