Case Study

Veidekke

On the Lysaker Station project, Veidekke protects millions in value by using Trimble Connect to resurrect 'dead data' into impactful decisions

“Using Trimble Connect, Construsoft and Norgeodesi’s expertise has optimized our survey management workflows so significantly that we have reclaimed capacity equal to a full-time position. Because the platform automates data updates, the information is always accurate—completely eliminating manual data handling.”

Øyvind SvalandSenior BIM and Digitalisation Coordinator, Veidekke
A construction site with buildings, equipment, and cranes; overlaid digital models in red and green highlight planned structures and underground utilities.

Reality capture and BIM come together in Trimble Connect, providing a clearer view of the project in its real-world context. Here, a point cloud of the existing neighborhood is combined with the 3D model of the underground metro station, helping project teams understand how the design relates to actual conditions above ground. 

For Øyvind Svaland, Senior BIM and Digitalisation Coordinator at Veidekke, the central obstacle on modern megaprojects is rarely a lack of data; it is ensuring that data can actually be leveraged when high-stakes decisions must be made on-site.

The construction of the new Lysaker station, part of Norway’s Fornebubanen metro development, is defined by extreme technical complexity. The team is responsible for producing over 800,000 BIM objects and handling over 2 million BIM objects on-site—all while managing hundreds of last-minute model revisions across multiple engineering disciplines.

At this scale, standard administrative delays or minor information gaps don't just slow down work—they trigger a compounding failure chain across productivity, quality assurance, and planning.

"Primarily, it is the overall ecosystem of the project that makes the Trimble portfolio invaluable to us here," explains Svaland. "Because when you're working on a project of this scale, the solutions need to work reliably every day. If something fails, the entire team feels it. Pressure increases, overtime increases, and the risk of mistakes increases."

A worker in safety gear operates a surveying instrument inside a tunnel, focusing on the equipment in the foreground.

No drawings, no paper. 30m underground, Veidekke’s rebar and concrete teams are managing multi-discipline production on their own via a single Trimble Connect BIM station. On to the next pour!

The solution: Eliminating manual office-to-field bottlenecks

To overcome these challenges and give teams the ability to work with IFC models in the field, Veidekke collaborated with Trimble, Construsoft and Norgeodesi. Utilizing Trimble Connect as the central connected data environment (CDE) established a direct line of sight between the design office and field crews.

Diagram showing Trimble Connect at the center, syncing data in real time between the design phase/models and surveyors field controllers/Trimble field solutions. Arrows indicate two-way data synchronization.

This bidirectional synchronization between the surveyors' field controllers and the central BIM collaboration platform effectively dismantled three major legacy time thieves that traditionally drain profitability from large-scale civil projects.

  • Minimized Data Preparation: The labor-intensive process of extracting and configuring staking data for field crews was eliminated.

  • Automated Revision Control: Survey teams and field devices have instantaneous access to the current, validated models.

  • Digital Documentation Flow: The need to physically locate, print, or retrieve physical paperwork for as-built validation or staked-out coordinates became obsolete. Everything is hosted, version-tracked, and pulled directly from the cloud.

“Using Trimble Connect, Construsoft, and Norgeodesi’s expertise has optimized our survey management workflows so significantly that we have reclaimed capacity equal to a full-time position. Because the platform automates data updates, the information is always accurate — completely eliminating manual data handling.” — Øyvind Svaland, BIM and Digitalization Coordinator, Veidekke

Crucially, field crews are never overwhelmed by data density. By leveraging the advanced processing capabilities of their field controllers, surveyors can easily filter and segment the master model.

"The ability to categorize 1,000,000 objects into manageable packages directly in the field controller is crucial for our surveyors to work efficiently," says Svaland.

A worker in safety gear operates a surveying instrument inside a tunnel, focusing on the equipment in the foreground.

Supported by Construsoft and Norgeodesi, a Veidekke surveyor uses Trimble SX12 to document milestones and as-built status to support project management and progress reporting. The point cloud data is made available and easy-to-use through Trimble Connect and Trimble Reality Capture Platform Service (TRCPS).

Mission-critical technology: Trimble Connect as CDE

The project uses Trimble Connect as its Common Data Environment (CDE) because it presents information in a consistent environment.

"In five years of continuous collaboration, we have never conducted a formal training session on Trimble Connect. It is flexible enough to break down complex data into simple, intuitive field workflows, allowing anyone to leverage the digital model without prior BIM expertise." — Anders Sand-Larsson, Innovation Lead, Construsoft

Two construction workers in orange safety gear look at a digital construction plan on a tablet at a building site with scaffolding, ladders, and safety equipment visible in the background.

On the K7 Fornebubanen project,Veidekke teams use Trimble Connect with Construsoft’s Labels extension to easily filter models and visualise rebar details before concrete pours. By making relevant model information easier to access on site, Labels helps field workers use BIM data directly in their installation work.

The process: Resurrecting ‘dead data’ for real-time value

A primary innovation of the workflow Veidekke and Construsoft designed centers on what happens to information after field teams record a measurement.

Traditional construction methodologies treat as-built data as an administrative afterthought. Historically, measured points remained trapped inside isolated, niche software environments like Gemini or Trimble Business Center (TBC). While these applications are excellent for processing final operation and maintenance handover documentation, data stored there remains functionally dead during active production; it offers zero assistance to teams solving active problems on the floor.

Comparison chart: Traditional data silo shows isolated field measurement leading to no active site impact. Viedekkes connected data flow uses Trimble Connect for immediate access by managers, crews, and clients.

Veidekke altered this dynamic by feeding field measurements straight back into Trimble Connect alongside design models, procurement schedules, and production timelines.

This context allows site managers to answer critical operational questions in real time: Is this concrete pour ready for the next structural phase? Does this physical installation match the design tolerance? Can we catch this variance before it turns into an expensive rework order?

"If a measured point is presented in the CDE alongside all other data, it creates an entirely different value. For example, combining models with real-time point clouds gives us definitive proof of late design revisions. That leaves zero doubt that rework costs belong to the design firm, not the contractor.” — Øyvind Svaland, BIM and Digitalization Coordinator, Veidekke

Another way Veidekke uses their data downstream is to ensure accurate billing and faster payment. “The whole project is divided into 12,000 unique codes that are connected to our 3D models, which facilitates our payment process where a single wall might have anywhere from four to 10 different codes attached to it. Our accounts receivable team has told me that getting paid on time without this platform [Trimble Connect] would not be possible,” says Svaland.

A worker in a hard hat and safety gear uses a tablet to inspect a construction site indoors, pointing at the screen while checking building details.

With Trimble SiteVision the team on site has the ability to overlay the models from Trimble Connect on the real world, and visually evaluate next steps in construction, identify potential challenges or mistakes — or it can be used as quality control afterwards. Any issues can be reported on the fly, within the context of the 3D models. See how it's used in the project.

The ROI: The multi-million NOK difference

Ultimately, digitalization of the Lysaker Station project isn't a minor optimization or a matter of convenience—it is a critical financial strategy. Veidekke's guiding operational principle requires that every single action field surveyors perform via Trimble Field Solutions must flow dynamically through Trimble Connect both ways.

By weaving 3D laser scans, Augmented Reality (AR) field visualizations, real-time production schedules, design statuses, and quality assurance into a single holistic data stream, Veidekke has achieved unprecedented operational clarity and client transparency.

"The data from our survey team serves as our definitive as-built documentation, proving exactly what has been executed on-site. When late-stage design revisions occur, Trimble Connect allows us to compare the tender model and the execution model side-by-side to isolate the exact variances. Providing our clients with this clear, visual proof is essential for validating change orders and securing fair compensation for additional work,” reports Svaland. “I don't believe any other software could resolve this challenge so effectively."

This structural shift transforms how risk is managed on-site, serving as the deciding factor between a highly profitable project and a financially draining one.

"This is where the real money is," Svaland concludes. "We are talking about a difference of millions of Norwegian kroner (NOK) between a good project and a bad one, based solely on how this data is handled. The value increases the more complicated the project becomes. In our case, with hundreds of last-minute revisions, it would have been impossible to solve this with any other methodology.”

Tags

Related case studies

Case study

How digital workflows made large-scale steel reuse possible

Learn how William Hare delivered 77% reclaimed steel on 30 Duke Street using Tekla Structures.
Read case study
Case study

Building water treatment at scale: RSE’s move to Tekla Structures

Discover how RSE tripled design output and unlocked manufacturing-ready detail with Tekla Structures.
Read case study
Case study

Case study: Digital workflows unify cross-border bridge build

Learn how Westmate used connected Trimble technology to eliminate downtime on an international steel construction project.
Read case study