How Fulton Hogan Cut an Infrastructure Timeline by 33% Using Connected Construction
When the New Zealand Transport Agency challenged principal contractor Fulton Hogan to shave a full one-third off the schedule for the State Highway 20B road widening project in Auckland, traditional building methods were off the table. To deliver critical airport access safely and quickly, the team turned the project "inside out"—shifting heavy paving operations to tricky night-time shifts.
Achieving daytime accuracy and premium ride quality in the dark required absolute precision. Fulton Hogan partnered with local SITECH dealers to deploy a full suite of Trimble connected construction technology across the entire jobsite.
Watch the video to see project leaders and chief surveyors break down exactly how they leveraged Trimble Earthworks, robotic Total Stations and digital data management to turn a massive scheduling challenge into a landmark infrastructure success.