Santiago Bernabeu Stadium Renovation Project

2 Procès-verbal lu
| |
mai 9, 2022

Partagez cet article :

Santiago Bernabéu stadium under renovation with cranes and scaffolding.

The new fixed roof structure, made of more than 9,000 tons of steel, consists of two 177 meters east-west trusses and four 144 meters cross trusses. The retractable roof slides on the inner cross trusses, divided into two panels composed of five 72×7 meters inflatable cushions between six 72.5 meters-span steel-composite hybrid trusses. At the ends are motorized bogies that carry out the translation and integrate the lifting mechanism.

Tekla 3D rendering of a complex steel structure with different colored beams and supports.

During the assembly process, the main trusses, which served as guides for the other trusses, transferred vertical loads to the two new evacuation towers on the west side and two articulated pendulums integrated into the building on the east side, while horizontal loads were completely decoupled from the existing structure. The stadium redevelopment also includes the installation of a video scoreboard.

The main trusses, which during assembly are the guide for the rest, transfer the vertical load to two new evacuation towers to the west and to two articulated pendulums integrated into the East Building, which in turn gathers horizontal forces next to the towers, completely independently of the existing structure.

The top of the arch is a 16.5-meter-high latticework that, together with the two towers, forms a mega-porch duckway. This supports the skywalk, a passageway.

Tekla 3D rendering of a complex steel structure with various colored beams, bolted connections, and diagonal bracing.

The East Building consists of 11 floors formed by 21 radial frames to the existing stadium, with two pillars, rigid nodes, transversal purlins, and a steel deck. At the ends, the building is stiffened with concrete cores that house lifts and evacuation staircases. In the upper zone, there is a spatial lattice crown, which is linked to the west through the corbels of the trusses at the bottom of the fixed roof, allowing complete circulation around the stadium.

Tekla 3D rendering of a steel structure with a pink main frame, yellow diagonal support beams, and purple connectors.
Tekla 3D rendering of a complex structural beam system with blue, green, and brown components.

The shape of the new exterior façade is obtained from the sweep of three curved lines that define the four main areas of the façade. Between the upper and intermediate façade, there is a crack that makes it independent from the rest of the parts. This intermediate façade of stainless-steel slats is supported by a structure of hollow steel ribs on the stadium axes and hangs from the new fixed roof, resting horizontally on the existing concrete ribs.

Cursor left to scroll through additional design images for the Santiago Bernabeu Stadium renovation project:

Slide 1 of 16

Attention

We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.

Cart updated
Some items in your cart are not available for purchase in your region, so we removed them. Please review your cart before proceeding.

Items Removed:
Attention

Le logiciel que vous essayez d'acheter n'est pas disponible dans votre pays ou votre région.

Cart updated
The items in your cart have been updated for two reasons. Firstly, the prices now match the currency linked to your account address. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

Items Removed:
Cart updated
The items in your cart have been updated for two reasons. Firstly, you've added too many of one item to your cart. Secondly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding.

Items Removed:
Cart updated
The items in your cart have been updated for three reasons. Firstly, the prices now match the currency linked to your account address. Secondly, you've added too many of one item to your cart. Thirdly, some items have been removed because they are not available for purchase in your region. Please review your cart before proceeding

Items Removed:
Cart updated

Votre devise a été modifiée et correspond maintenant à la devise associée à l'adresse de votre compte.

Cart updated

Votre panier a été mis à jour pour deux raisons. Tout d'abord, les prix reflètent maintenant la devise liée à l'adresse de votre compte. De plus, vous aviez ajouté au panier un article en trop grande quantité. Vérifiez votre panier avant de poursuivre.

Cart updated

En combinant les produits de votre panier d'invité avec ceux de votre panier enregistré, vous avez dépassé la quantité maximale autorisée pour au moins un article. Vérifiez votre panier et rectifiez les quantités avant de passer au paiement.

Attention

We were unable to access your account information. Please contact customer support for assistance.

Attention
Impossible de mettre à jour les informations du panier d'achat. Veuillez actualiser la page pour résoudre le problème. Si le problème persiste, merci de Contactez l'assistance Trimble.
© 2026 Trimble Inc.

Trimble est une entreprise technologique internationale qui connecte le monde physique au monde numérique, transformant ainsi les méthodes de travail. Par son innovation constante dans le domaine du positionnement précis, de la modélisation et de l'analyse des données, Trimble est au service de secteurs essentiels tels que la construction, la technologie géospatiale et le transport. Qu'il s'agisse d'aider les clients à construire et à exploiter des infrastructures, à concevoir et à construire des bâtiments, à optimiser les chaînes d'approvisionnement mondiales ou à cartographier le monde, Trimble est à l'avant-garde, favorisant la productivité et le progrès.