Skip to content

COLLEGE ZAC BELCIER - ASTREE

2 minute read
|
June 7, 2024

Share this post:

Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE

About the project

Category: Public Project Project name: COLLÈGE ZAC BELCIER Company: ASTREE Project location: BORDEAUX (33), France

The project in pictures

Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024 COLLÈGE ZAC BELCIER, ASTREE
Trimble Construction Awards 2024, COLLÈGE ZAC BELCIER, ASTREE

The project in figures

Surface area: 9,000 m² sp Cost (excl. VAT): €28,000,000 Start of project: 2018 Handover at start of school year: 2022

Trimble products used

Tekla Structures

Project description

Part of the Plan Colleges launched in the French department in 2017, the new college will accommodate no fewer than 700 students and has been designed to have a minimal carbon footprint. The project calls for the creation of a secondary school with a ground floor teaching area, R+1 R+2 and a residential area with R+2 / R+3 wooden attics. It is divided into 9 earthquake-resistant blocks.

This project is entirely interoperable between all participants (BIM approach) with a specific and unique graphic charter for each participant.

Most of the building is of concrete construction, with insulated precast facades. The living quarters are timber-framed, the sports hall is timber-framed, and the courtyard is steel-framed.

A special feature of this school is the sports field on its roof. Carbon footprint :

  • Connected to the district heating network

  • Energy production using photovoltaic panels

  • Installation of equipment to limit water consumption, wastewater discharge and treatment, and installation of rainwater recovery tanks.

  • Greenhouse gas emissions from buildings limited by timber framing, walls and insulation.

  • Appropriate sun protection

  • Double-flow ventilation

Challenges to meet

  • Layout of precast walls

  • Prefa in the gymnasium area

  • Interface between concrete elements and carpenter

ASTREE's main role

Design office during the execution phase

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

Visualize and build automated warehouse systems with SketchUp

Senior Applications Engineer at TGW, an international provider of warehouse automation solutions, sh...
Read full article
Article

What are Digital Twins?

A digital twin in construction is a dynamic, living digital replica of a physical asset—such as a bu...
Read full article