About the project
Category: Small-scale project Project name: PAVILLON CONTEMPORAIN Company: GUILLERM Project location: CARANTEC (29), France
The project in pictures






Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.
We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.
The software you are trying to purchase is not available in your country or region.
Your currency has been changed to match the currency associated with your account address.
Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.
While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.
We were unable to access your account information. Please contact customer support for assistance.

Category: Small-scale project Project name: PAVILLON CONTEMPORAIN Company: GUILLERM Project location: CARANTEC (29), France










Living area: 136 m² Concrete: 137 m³ Precast concrete: 214 tonnes Panels: 27 Pre-slabs: 11 Solid slabs: 8 Stairs: 2, concrete quarters 2 Posts: 4 Beams: 6 Cap: 1 Longrines: 25 Cost excluding land: ~340 k€
Tekla Structures Trimble Connect Trimble Field Link
The project is an example of a pavilion built by the Guillerm company.
The concept is an original company process: prefabricated concrete houses delivered turnkey in 5 months. We control the entire Pavillon chain.
The architectural design office and sales staff produce a model and custom-built bungalow plans according to the customer's wishes. Once the CCMI has been signed and the building permit has been accepted, the design office takes charge of sizing the structure and drawing up the manufacturing plans. The production department then collects the manufacturing drawings and produces the prefabricated elements in the factory. Finally, the construction department coordinates the assembly of the pavilion.
We have been choosing Tekla for our housing business for 5 years now.
Initially, we wanted software that would enable us to produce more drawings, while increasing their quality and detail. That's what we've achieved with custom components.
For example, an 80m² single-storey bungalow can be designed in 2/3 days by our teams. For larger bungalows >200m² with elaborate architecture (i.e. +150 plans), it can take up to a fortnight.
Secondly, we wanted to introduce the use of digital technology directly on site. This has now been achieved with the use of Trimble Connect by site managers. They have access to the IFC model, general plans and fabrication drawings.
Today, we've taken Trimble's solutions a step further. We install our own pavilions using the Trimble RPT600 station and Trimble Field Link software. We're making progress on the methods aspect of our pavilions, integrating weight verification of prefabricated elements via the Tekla Crane tool, and we're creating 3D shoring for our multi-storey pavilions where necessary.
All the pavilions are designed by an architectural department. They use MIAO software to produce a 3D model. This is then exported and transformed into a Tekla-readable SketchUp version.
We developed a long list of customized components to optimize the overall modeling time of a pavilion. Components were created for each room type (insulated footings, stringers, solid slabs, columns) and Tekla component settings were made (composite wall, crane tools, composite floor).
All our pavilion assembly teams have a tablet with the Trimble Connect application installed. This gives them access to the complete assembly file (IFC model, manufacturing plans, general plans, etc.) for the pavilion in progress. This enables them to assemble the house simply by viewing the model, to improve their understanding of certain reinforcement nodes or to point out certain non-conformities.
Design office during the execution phase