Category: Public Project Project name: GARE DE LA DÉFENSE, CNIT, RER E Company: VIRY Project location: PUTEAUX (92), France

The project in pictures

Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE CNIT RER E, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE, VIRY
Trimble Construction Awards 2024, GARE DE LA DÉFENSE, VIRY

The project in figures

Avonite surface area to be maintained: 5,000 m² Steel: 307 tonnes Structural cost: €7 million

Trimble products used

Tekla Structures Tekla Model Sharing Trimble Connect Tekla Live Link via Grasshopper

Project description

The EOLE project, an extension of RER E to the west, includes a new station at La Défense. This underground station is built under the existing CNIT ERP. The station's concourse is located on level J, the tenth level below the Parvis de la Défense, 30 meters below the level of the Parvis.

The walls and ceilings of the connecting corridors of the emergences (accesses and exits to the outside) will be clad with a covering called "white form". It is made from a solid surface composite material. This process of curved shapes, invisibly fastened by inserts, is part of an innovative ATEx-certified system. VIRY is responsible for the design and installation of "solid surface" ceiling cladding panels.

Also, as an extension of our SOADEF3 contract, SNCF Réseau has renewed its confidence in us by entrusting us with the cladding work on the walls on the 10th and 11th and final levels beneath the station. In the CNIT station, with its underground architecture (30 m below the parvis de la Défense), this involves cladding the station's side walls in polished stainless steel sheet, using shaped, draped panels to create an undulating mirror effect.

Challenges to meet

The highly complex geometry of the Avonite panels. Using Tekla live Link via grasshopper was the key to the project's success.

From prototype to finished model, the 3D model was used to communicate both internally and externally. Exports were used for BIM synthesis. The Trimble Connect model was at the heart of the project. Daily exports were made to share, in a fragmented or global way, with our various departments. Trimble Connect was also used as a "3D assembly plan" for the installation of all structures.

VIRY's main role

Builder / Manufacturer

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

Visualize and build automated warehouse systems with SketchUp

Senior Applications Engineer at TGW, an international provider of warehouse automation solutions, sh...
Read full article
Article

What are Digital Twins?

A digital twin in construction is a dynamic, living digital replica of a physical asset—such as a bu...
Read full article