
About the project
Category: Tertiary HVAC-Elec. project Project name: IFIP Company: MISSENARD CLIMATIQUE Project location: PACE (35), France
The project in pictures





Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.
We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.
The software you are trying to purchase is not available in your country or region.
Your currency has been changed to match the currency associated with your account address.
Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.
While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.
We were unable to access your account information. Please contact customer support for assistance.

Category: Tertiary HVAC-Elec. project Project name: IFIP Company: MISSENARD CLIMATIQUE Project location: PACE (35), France









Project surface area: 2,500 m² Air network length: 550 ml Number of ventilation diffusers: 118 1 x 5,000 m3/h air handling unit Total cost: €228,000
Trimble Nova Trimble Connect
The project concerns the construction of an office building. Our services include ventilation and sanitary plumbing.
Carrying out the project with Trimble Nova brought several benefits:
Saves design time because calculation notes are generated by the software
Simplified synthesis thanks to NOVA software's clash detection function and visualization of the 3D model in Trimble Connect
Saves time on material disbursements, since we can output parts lists via the software
3D images of the installation printed on the paper plans to allow workers to better visualize the layout of the networks
Execution/Installation