
About the project
Company: SUD ETUDES ET EQUIPEMENTS INDUSTRIE Project location: MARSEILLE 13008, France
The project in pictures





Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.
We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.
The software you are trying to purchase is not available in your country or region.
Your currency has been changed to match the currency associated with your account address.
Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.
While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.
We were unable to access your account information. Please contact customer support for assistance.

Company: SUD ETUDES ET EQUIPEMENTS INDUSTRIE Project location: MARSEILLE 13008, France



















Cost of marine works: 6.9 million euros Total surface area of project: 49,000 m² North quay surface: 350 m² Inner breakwater: 750 m² Pôle France boom: 45 m² Concrete volume: 630 m3 Weight of reinforcement: 80 Tons
Tekla Structures Tekla Model Sharing
Marina of the nautical stadium for the 2024 Olympics in Marseille.
The challenge of this project was to design a prefabricated structure on offshore piles, interfacing with the existing quay.
Assembly of the prefabricated parts went very smoothly on site.
We studied the prefabricated structures and 3D reinforcement on Tekla Structures.
Design office during the execution phase