Skip to content

PALAIS DES SPORTS DE CAEN LA MER (14) - BAUDIN CHATEAUNEUF

2 minute read
|
May 30, 2023

Share this post:

Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer

About the project

Category: Sport and Leisure Project Company: BAUDIN CHATEAUNEUF Project Location: CAEN, France

The project in pictures

Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer
Trimble Construction Awards - Baudin Chateauneuf, Palais des sports de Caen la Mer

The project in figures

Area: 16 000m ² Total cost: 40 000 000 Euros Weight steel: 325 Tons Concrete: 11 000 Overall dimensions: Ht 14 m, Ø77 m

Trimble products used

Tekla Structures Tekla Model Sharing

Project description

16,000m² sports hall, mainly for basketball and handball, with a capacity of 4,200 spectators and 270 underground parking spaces.

An ovoid-shaped enclosure whose main framework consists of 6 lattice trusses 62 m long and 4.7 m high

Challenges to meet

  • In view of the short design times involved, Model Sharing enabled us to pool our draughtsmen - nine in total, and up to five simultaneously. As a result, we were able to complete modeling, layout, manufacturing and assembly files in just under 10 months.

  • We were able to model a circular frame in BIM in collaboration with the mason and the barder. This enabled us to ensure just the right continuity between the bending radii of concrete, framework and cladding. As a result, no problems were encountered during installation.

  • Given the shape of the building and the number of players involved, we're proud of the success of this project, both in terms of the synthesis with the various trades, facilitated by BIM, and the coordination of our draughtsmen thanks to Tekla Model Sharing.

Main role of BAUDIN CHATEAUNEUF

Builder / Manufacturer

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

Visualize and build automated warehouse systems with SketchUp

Senior Applications Engineer at TGW, an international provider of warehouse automation solutions, sh...
Read full article
Article

What are Digital Twins?

A digital twin in construction is a dynamic, living digital replica of a physical asset—such as a bu...
Read full article