Skip to content

PIERS - ENGINEERING ELEMENTS

2 minute read
|
March 19, 2024

Share this post:

Trimble Construction Awards - Eléments Ingenièrie, Les Jetées

About the project

Category: Commercial HVAC - Elec. Company: ÉLÉMENTS INGENIÉRIE Project location: HUNINGUE (Haut-Rhin), France Client: Constructa Promotion Architect: Nicolas Laine Architecte

The project in pictures

Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées
Trimble Construction Awards - Eléments Ingenièrie, Les Jetées

The project in figures

Surface area: 5065 m2 Cost of works excluding VAT: €25 M

Trimble products used

Stabicad Trimble Connect

Project description

This project involves the construction of a coliving building, part of a real estate complex called "Les Jetées". It will be built as part of the Rhine banks development project in Huningue.

Their architectural ambitions and the resonance between exterior and interior spaces call for in-depth thermal studies. This was done in close collaboration with the structural design office, given the constraints of seismic zone 3.

Our design office was responsible for 2 separate work packages for Building C: the HVAC and smoke control work package, and the plumbing and sanitary work package. This included the design and sizing of the ventilation and smoke extraction networks, as well as the drinking water supply networks (hot, loop and cold water), and the drainage networks.

Challenges to meet

  • ERP in the middle of the building (sauna and sports hall), implying compliance with different standards within the same project.

  • Hybridization of heat production

  • Thermal studies RT2012 -20% discount

  • Ground-floor retail outlets, involving substantial extraction ducts

Main role of ÉLÉMENTS INGENIÉRIE

Design office with supervision of execution

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

What are Digital Twins?

A digital twin in construction is a dynamic, living digital replica of a physical asset—such as a bu...
Read full article
Article

Visualize and build automated warehouse systems with SketchUp

Senior Applications Engineer at TGW, an international provider of warehouse automation solutions, sh...
Read full article