About the project
Category: Public Project Project name: EXTENSION DE L'ÉCOLE 42 Company: BAUDIN CHATEAUNEUF Project location: PARIS (75 017), France
The project in pictures





Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.
We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.
The software you are trying to purchase is not available in your country or region.
Your currency has been changed to match the currency associated with your account address.
Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.
While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.
We were unable to access your account information. Please contact customer support for assistance.

Category: Public Project Project name: EXTENSION DE L'ÉCOLE 42 Company: BAUDIN CHATEAUNEUF Project location: PARIS (75 017), France












Overall dimensions: 42 m x 19 m over 5 storeys Floor area: 3,500 m² Structural steelwork: 250 tonnes, including 90 T for the 6 lattice girders (divided into 16 sections) Total projected cost: €25,500,000
Tekla Structures Tekla Model Sharing Trimble Connect
École 42 is a digital business school founded by Xavier Niel, and is located in the 17th arrondissement of Paris.
The project concerns the extension of Ecole 42, involving the construction of the structural steelwork, collaborative floors and fire protection. As part of this extension, 5 additional levels will be created (R+3 to R+7), in order to increase student capacity. At R+4, steel lattice girders with spans of 25 to 40m are installed on the facade and inside the building, supporting the frameworks of the upper levels.
Erecting the lattice girders in 16-meter sections, for a total assembled length of 41 meters, in the heart of the 17th arrondissement of Paris, was a major challenge. Logistical constraints, such as night-time deliveries and restricted manoeuvring space, required meticulous planning to ensure the success of the operation, but facilitated by the modelling of the lattice girders' packaging for exceptional transport on Tekla. In addition, modelling the lattice girders with chamfer details for workshop assembly sketches represented a major technical challenge. The high loads borne by the lattice girders necessitated specific welding preparations. By using Trimble solutions, in particular Model Sharing on Tekla, we were able to streamline the work of the draftsmen and optimize the modeling of the project, thus facilitating coordination with the other project lots. Indeed, the use of reference models on Tekla also played a crucial role in simplifying the synthesis with the architect between our structural steelwork lot, the shell lot and the façade builder. What's more, the Trimble Connect project has become a central collaboration tool, enabling us to share the model each time the Tekla model is transmitted. This enabled us to share information almost instantaneously with the calculation engineers and the in-house project manager. Using Trimble Connect, we were able to :
Share execution plans with the project manager for validation.
Annotate drawings before distribution to customer.
Distribute manufacturing files to our workshops.
Monitor progress on IFCs with the help of the organizer.
Forward assembly drawings and IFCs to on-site assembly teams.
Design office during the execution phase