About the project
Category: Commercial Project Company: KP1 BATIMENTS Project Location: LYON, France
The project in pictures





Trimble is a global technology company that connects the physical and digital worlds, transforming the ways work gets done. With relentless innovation in precise positioning, modeling and data analytics, Trimble enables essential industries including construction, geospatial and transportation. Whether it's helping customers build and maintain infrastructure, design and construct buildings, optimize global supply chains or map the world, Trimble is at the forefront, driving productivity and progress.
We tried to combine the products in your guest cart with your saved cart, but we encountered an issue while merging them. When choosing a subscription, please select either monthly or yearly as they cannot be combined. Kindly review your cart before proceeding to checkout.
The software you are trying to purchase is not available in your country or region.
Your currency has been changed to match the currency associated with your account address.
Your cart has been updated for two reasons. First, the prices now reflect the currency associated with your account address. Second, you've added too many of one item to your cart. Please review your cart before proceeding.
While combining the products in your guest cart with your saved cart, at least one item in your cart has exceeded the maximum allowable quantity. Please review and correct your cart before proceeding to checkout.
We were unable to access your account information. Please contact customer support for assistance.

Category: Commercial Project Company: KP1 BATIMENTS Project Location: LYON, France














Number of beams: 317 Number of prefabricated columns: 98 Honeycomb slabs: 20,000 m2 Horizontal: 3,528 m3 Vertical: 1,572 m3
Tekla Structures Trimble Connect Total Station
This project is the fruit of a partnership between Lyon Parc Auto (LPA), Banque des Territoires, Groupe SERL and La Poste Immobilier.
The urban logistics hotel will cover more than 28,000m², over a third of which will be allocated to La Poste subsidiaries Urby and DPD.
The space is divided over 2 levels, accessible to heavy goods vehicles, and will meet the urban logistics needs of the Lyon conurbation.
The future HLU is fully in line with our commitment to making cities more breathable, by tackling the problem of last-mile deliveries, while respecting La Poste's commitment to introduce gentle delivery methods.
In addition, a photovoltaic power plant with over 15,000 m² of panels will supply power to buildings that meet the highest environmental standards, with HQE certification at the excellent level.
Huge Trimble connect advantage: data exchange with manufacturer, fitter and site supervisor; efficient use of drawing box.
Linking Tekla manufacturing drawings to the Trimble Connect model.
On-site 3D surveys with Trimble Total Station and 3D model link.
The 3D model was used to set the connections between posts and PEIKKO inserts.
"I'm particularly proud to have succeeded in this project, which represented a challenge for the company."
Design office during the execution phase