Skip to content

Banner Health Leveraging Technology for Visibility, Control and Growth

"Quite frankly, I couldn’t function in my job without a system like e-Builder."VP of Design and ConstructionKip Edwards

Leveraged $70 million in savings from active projects to fund a new cancer center and identified and reallocated an additional $22 million.

Challenges
  • Inability to accurately gauge financial and schedule performance across entire portfolio.

  • Data buried in outdated spreadsheets and differing reporting methods.

  • Limited visibility and cost control between construction management and accounting practices.

Solution
Results
  • Complete visibility of all construction program costs and schedules.

  • Ability to accurately track spending, forecast savings, and mine money from active projects to fund new work.

  • Leveraged $70 million in savings from active projects to fund a new cancer center.

  • Identified and reallocated an additional $22 million.

  • Enabled an efficient cost forecasting process (eliminated the chance of surprise overruns).

  • Easy and accurate real-time reporting.

  • Confidence to meet ambitious growth goals.

Similar documents

eBook: Subscribe to a new way of purchasing construction technology with Trimble Works Plus
Document

eBook: Subscribe to a new way of purchasing construction technology with Trimble Works Plus

This eBook reveals a convenient way to purchase Trimble Works Plus solutions: with reduced up-front ...
Read document
eBook: Subscribe to a new way of purchasing construction technology with Trimble Works
Document

eBook: Subscribe to a new way of purchasing construction technology with Trimble Works

A Trimble Works subscription enables greater productivity and profitability. This eBook outlines the...
Read document
Trimble ProjectSight Product Feature Sheet
Document

Trimble ProjectSight Product Feature Sheet

ProjectSight makes digital project and jobsite management accessible to every construction professio...
Read document