Modeling and fabricating a massive, 295,000 sq. ft. East Hangar for United Airlines
Discover how Sanria Engineering delivered 6,400 tons of structural steel detailing for this massive aviation landmark. Using Tekla Structures and BIM/VDC, Sanria managed complex 300-ft clear span box trusses and intricate connection designs.
In collaboration with AECOM Hunt and The Herrick Corp, Sanria resolved structural conflicts 6 months before fabrication, ensuring a seamless erection process. From CNC files to erection drawings, learn about the engineering precision behind one of the world's largest maintenance hangars.
Similar documents

DocumentTrimble Novapoint civil engineering design brochure
A successful construction of infrastructure projects, require a detailed, coherent infrastructure mo...
Read document 
DocumentTekla PowerFab: Connected Steel Fabrication
Connect estimating, detailing and production into one real-time fabrication suite. Eliminate guesswo...
Read document 
DocumentThe £36bn Question: Is your operation ready for hyperscale?
Learn the requirements for hyperscale data centres, from speed mandates to tech stack prequalificati...
Read document